In Bishops Court, Cape Town, the leveling of a prime property situated on a slope required the execution of approximately 2020 m³ cut and fill earthworks.
7/2019 – Accommodating a pool with Terraforce
← 7/2019 – Accommodating a pool with Terraforce
In Bishops Court, Cape Town, the leveling of a prime property situated on a slope required the execution of approximately 2020 m³ cut and fill earthworks.
Join our mailing list to receive the latest news and updates from our team.