10/2016 – Terraforce walls free up space for Military Parade Grounds

As construction proceeded on an ablution block at the foot of the grounds, it became necessary to retain the cut slopes between the building and existing access road above.

As construction proceeded on an ablution block at the foot of the grounds, it became necessary to retain the cut slopes between the building and existing access road above.

As construction proceeded on an ablution block at the foot of the grounds, it became necessary to retain the cut slopes between the building and existing access road above.
Print Friendly, PDF & Email
Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

* 4 + 1 =