As construction proceeded on an ablution block at the foot of the grounds, it became necessary to retain the cut slopes between the building and existing access road above.
ByKarin|PublishedOctober 24, 2016| Full size is 600 × 338 pixels
As construction proceeded on an ablution block at the foot of the grounds, it became necessary to retain the cut slopes between the building and existing access road above.