Because of the particular soil conditions, it was decided to line/demarcate the dam perimeter with a dam ‘wall’ to ensure long-term sustainability.
6/2005 – Total Turnaround for Suburbs Wetland
← 6/2005 – Total Turnaround for Suburbs Wetland
Because of the particular soil conditions, it was decided to line/demarcate the dam perimeter with a dam ‘wall’ to ensure long-term sustainability.
Join our mailing list to receive the latest news and updates from our team.