Two of the three main rear concrete block walls were provided with 300kN tie-back anchorages and concrete waler beams.
11/2018 – 12m High Terraforce Wall with Specialist Geotechnical Engineering
← 11/2018 – 12m High Terraforce Wall with Specialist Geotechnical Engineering
Two of the three main rear concrete block walls were provided with 300kN tie-back anchorages and concrete waler beams.
Join our mailing list to receive the latest news and updates from our team.