To prepare the site for a future railway siding a 600m
long x 9m high retaining wall supporting the embankment
had to be designed offering true plantablity. Terraforce
was the ideal choice for this environmentally sensitive
installation.
The units were produced at a local factory only a few
kilometres from the site to standards set by Terraforce.
Two & a half months after 60 000 Terraforce L13
blocks were delivered to the site, the contract was
completed; within the prescribed time frame.